Smart electricity meters
In a society that is more and more aware of energy consumption, the need for mapping and controlling the energy consumption rises.
In order to get to this, there was a project started at Concrete.
The contribution of Frist was to give support in the area of moldability and detailing the concepts in CAD. Of great importance were the design limitations regarding the electricity norms in relation with the electrical breakdown and electrical creepage distance.
Protection of the installer and preventing electrocution were very important factors of designing the housings.
Pictures are delivered by Concrete